{"id":4072,"date":"2020-12-08T14:06:12","date_gmt":"2020-12-08T13:06:12","guid":{"rendered":"http:\/\/new.peoab.com\/references\/"},"modified":"2022-01-24T09:55:41","modified_gmt":"2022-01-24T08:55:41","slug":"references","status":"publish","type":"page","link":"https:\/\/www.peoab.com\/en\/references\/","title":{"rendered":"References"},"content":{"rendered":"\t\t
| Purchaser<\/th> | End user<\/th> | Scope of supply<\/th> | Year<\/th><\/tr><\/thead> |
|---|---|---|---|
| Chemetics Inc, Canada<\/td> | PT Tanjungenim Lestari P&P<\/td> | Supply of spare parts<\/td> | 2013<\/td><\/tr> |
| Metso\/Valmet Power Oy<\/td> | BillerudKorsn\u00e4s, Karlsborg<\/td> | Project management assistance for a DNCG system<\/td> | 2013-2014<\/td><\/tr> |
| Metso Power Oy<\/td> | Advance Agro Pulp Mill<\/td> | Process design Bleach Plant Scrubber<\/td> | 2013<\/td><\/tr> |
| Metso Power Oy<\/td> | Mets\u00e4 Board Husum<\/td> | Sales assistance<\/td> | 2013<\/td><\/tr> |
| Metso\/Valmet Power AB<\/td> | S\u00f6dra Cell, V\u00e4r\u00f6<\/td> | Pre-engineering of sludge system<\/td> | 2014<\/td><\/tr> |
| Chemetics Inc., Canada<\/td> | Weyerhauser, USA<\/td> | Supply of spare parts \u2013 new Pump tank and section No1<\/td> | 2014<\/td><\/tr> |
| Valmet Power Oy<\/td> | Guaiba project, Brazil<\/td> | Project- and Purchase management assistance for a Bleach Plant Scrubber<\/td> | 2014<\/td><\/tr> |
| Mets\u00e4 Board, Husum, Sweden<\/td> | -<\/td> | Preliminary design of final white liquor oxidation<\/td> | 2014<\/td><\/tr> |
| Chemetics Inc, Canada<\/td> | Musi Pulp, Indonesia<\/td> | Supply of spare parts \u2013 droplet separator<\/td> | 2014<\/td><\/tr> |
| Mets\u00e4 Board, Husum, Sweden<\/td> | -<\/td> | Detail engineering of new wlox reactor.<\/td> | 2014<\/td><\/tr> |
| Valmet Power AB<\/td> | S\u00f6dra Cell V\u00e4r\u00f6<\/td> | Detail engineering of new sludge hydrolyze plant<\/td> | 2014-2015<\/td><\/tr> |
| Valmet Power AB<\/td> | Not disclosed<\/td> | Basic process engineering of new sludge hydrolyze plant<\/td> | 2014<\/td><\/tr> |
| Valmet Power AB<\/td> | Not disclosed<\/td> | Basic process engineering of new sludge hydrolyze plant<\/td> | 2014-2015<\/td><\/tr> |
| Valmet AB, Sweden<\/td> | S\u00f6dra Cell V\u00e4r\u00f6<\/td> | Manufacturing drawings for sludge hydrolyze process tanks<\/td> | 2015<\/td><\/tr> |
| Chemetics Inc., Canada<\/td> | IP Eastover mill, USA<\/td> | Spare parts to CNCG burner<\/td> | 2015<\/td><\/tr> |
| Chemetics Inc., Canada<\/td> | Musi P&P, Indonesia<\/td> | PVC & CPVC installation details<\/td> | 2015<\/td><\/tr> |
| Valmet AB, Sweden<\/td> | IKPP; Perawang, Indonesia<\/td> | On site study<\/td> | 2015-2016<\/td><\/tr> |
| Eurocon Engineering AB, Sweden<\/td> | Pulp mill, Sweden<\/td> | Cost estimate piping & equipment<\/td> | 2015<\/td><\/tr> |
| Eurocon Engineering AB, Sweden<\/td> | SCA \u00d6strand, Sweden<\/td> | Process consultant<\/td> | 2016-2018<\/td><\/tr> |
| Mondi Dyn\u00e4s, Sweden<\/td> | -<\/td> | Manufacturing drawing<\/td> | 2016<\/td><\/tr> |
| Valmet AB, Sweden<\/td> | S\u00f6dra Cell V\u00e4r\u00f6<\/td> | Start-up sludge hydrolyze plant<\/td> | 2016<\/td><\/tr> |
| Mondi Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare parts to CNCG burner<\/td> | 2016<\/td><\/tr> |
| Mondi Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare part to steam boiler<\/td> | 2016<\/td><\/tr> |
| Mondi Dyn\u00e4s, Sweden<\/td> | -<\/td> | DNCG Droplet separator<\/td> | 2016<\/td><\/tr> |
| Norco Plast AB<\/td> | Mets\u00e4 Board, Husum Mill<\/td> | Droplet separator<\/td> | 2016<\/td><\/tr> |
| Valmet AB, Sweden<\/td> | SCA \u00d6strand, Helios<\/td> | Process support \u2013 sludge hydrolyze plant<\/td> | 2017<\/td><\/tr> |
| MISTAB<\/td> | Mondi, Dyn\u00e4s<\/td> | Project management - CNCG condensor<\/td> | 2017<\/td><\/tr> |
| MISTAB<\/td> | Vallvik<\/td> | Project management - Re-build of condensate tank<\/td> | 2017<\/td><\/tr> |
| Mondi Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare parts to CNCG burner<\/td> | 2017<\/td><\/tr> |
| S\u00f6dra Cell, M\u00f6rrum<\/td> | <\/td> | Flame arrestor<\/td> | 2017<\/td><\/tr> |
| MISTAB<\/td> | Mondi, Dyn\u00e4s<\/td> | Project management - Pressure vessel<\/td> | 2018<\/td><\/tr> |
| Eurocon Engineering AB, Sweden<\/td> | Chemical mill, Sweden<\/td> | Cost estimate piping & equipment<\/td> | 2018<\/td><\/tr> |
| Eurocon Engineering AB, Sweden<\/td> | SCA \u00d6strand, Sweden<\/td> | Project management - Re-build of condensate tank<\/td> | 2018<\/td><\/tr> |
| Mondi Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare parts to CNCG burner<\/td> | 2018<\/td><\/tr> |
| Norco Plast AB<\/td> | Mets\u00e4 Board, Husum Mill<\/td> | Droplet separator<\/td> | 2018<\/td><\/tr> |
| Chemetics Inc<\/td> | NIPPON DYNAWAVE PACKAGING \/ LONGVIE<\/td> | Distribution trays<\/td> | 2018<\/td><\/tr> |
| Chemetics Inc<\/td> | PT TANJUNGENIM LESTARI PULP & PAPER<\/td> | Droplet separator<\/td> | 2018<\/td><\/tr> |
| MISTAB<\/td> | Mondi, Dyn\u00e4s<\/td> | Project management \u2013 adding spry nozzles to flue gas scrubber<\/td> | 2018<\/td><\/tr> |
| Eurocon Engineering AB<\/td> | Ahlstrom Munksj\u00f6 Paper AB, Billingsfors<\/td> | Mechanical service CNCG burner<\/td> | 2018<\/td><\/tr> |
| Valmet AB<\/td> | SAPPI; Ngodwana, South Africa<\/td> | Spare parts to Bleach Plant Scrubber<\/td> | 2018-2019<\/td><\/tr> |
| Mondi Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare parts to CNCG burner<\/td> | 2018-2019<\/td><\/tr> |
| Eurocon Engineering AB<\/td> | Chemical mill<\/td> | Cost estimate piping & equipment<\/td> | 2019<\/td><\/tr> |
| Chemetics Inc<\/td> | Kinleiths Pulp, New Zealand<\/td> | Mechanical calculations<\/td> | 2019<\/td><\/tr> |
| Eurocon Engineering AB<\/td> | Alhstom-Munksj\u00f6, Billingsfors<\/td> | Mechanial service CNCG\/Burner<\/td> | 2019<\/td><\/tr> |
| MISTAB<\/td> | Mondi, Dyn\u00e4s<\/td> | Project management - Black liquor coolers<\/td> | 2019<\/td><\/tr> |
| MISTAB<\/td> | Eurocon Engineering \/ MoRe<\/td> | Project management - pre-engineering project<\/td> | 2019<\/td><\/tr> |
| Termap AB<\/td> | -<\/td> | Process design venting scrubber<\/td> | 2019<\/td><\/tr> |
| Mondi, Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare part to CNCG burner<\/td> | 2019<\/td><\/tr> |
| Chemetics Inc<\/td> | PT Riau Andalan P&P, Indonesia<\/td> | Droplet separator<\/td> | 2019<\/td><\/tr> |
| MISTAB<\/td> | Ocean TuniCell AS, Norge<\/td> | Cost estimate, equipment design<\/td> | 2020<\/td><\/tr> |
| Eurocon Engineering AB<\/td> | Not disclosed<\/td> | Project management<\/td> | 2020<\/td><\/tr> |
| Mondi, Dyn\u00e4s Sweden<\/td> | -<\/td> | Spare part to CNCG burner<\/td> | 2020<\/td><\/tr> |
| Chemetics Inc<\/td> | PT TANJUNGENIMP&P, Indonesia<\/td> | Droplet separator<\/td> | 2020<\/td><\/tr> |
| MISTAB<\/td> | Iggesund<\/td> | Project management & erection supervision<\/td> | 2020-21<\/td><\/tr> |
| S\u00f6dra Cell<\/td> | M\u00f6rrum<\/td> | Flamskydd<\/td> | 2020<\/td><\/tr> |
| Mondi, Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare part to CNCG burner<\/td> | 2020<\/td><\/tr> |
| Mondi, Dyn\u00e4s, Sweden<\/td> | -<\/td> | New CNCG combustion chamber.<\/td> | 2021<\/td><\/tr> |
| Mondi, Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare part to CNCG burner<\/td> | 2021<\/td><\/tr> |
| Chemetics Inc, Canada<\/td> | NIPPON DYNAWAVE PACKAGING<\/td> | Spare part to ClO2 absorber<\/td> | 2021<\/td><\/tr> |
| Norco Plast AB<\/td> | Mets\u00e4 Board, Husum Mill<\/td> | Droplet separator to Bleach Plant Scrubber<\/td> | 2021<\/td><\/tr> |
| MISTAB<\/td> | Iggesund<\/td> | Assembley supervisor for a rotary blower<\/td> | 2021<\/td><\/tr> |
| Mondi, Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare part to CNCG burner<\/td> | 2021<\/td><\/tr> |
| Chemetics Inc, Canada<\/td> | NIPPON DYNAWAVE PACKAGING USA<\/td> | Top Cap ClO2 absorber<\/td> | 2021-22<\/td><\/tr> |
| Mondi, Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare part to CNCG burner<\/td> | 2022<\/td><\/tr> |
| Eurocon Engineering AB<\/td> | not disclosed<\/td> | Cost estimation<\/td> | 2022<\/td><\/tr> |
| S\u00f6dra Cell<\/td> | M\u00f6nster\u00e5s<\/td> | Flamskydd<\/td> | 2023<\/td><\/tr> |
| Eurocon Engineering AB<\/td> | not disclosed<\/td> | Saftey valve<\/td> | 2023<\/td><\/tr> |
| Chemetics Inc. Canada<\/td> | NIPPON DYNAWAVE PACKAGING USA<\/td> | Top Cap ClO2 absorber<\/td> | 2023-24<\/td><\/tr> |
| Celulosa Arauco y Constituci\u00f3n S.A.<\/td> | Celulosa Planta Nueva Aldea<\/td> | Instructions for Bleach Plant Scrubber<\/td> | 2024<\/td><\/tr> |
| Mondi, Dyn\u00e4s, Sweden<\/td> | -<\/td> | Spare part to CNCG burner<\/td> | 2024<\/td><\/tr> |
| Chemetics Inc, Canada<\/td> | NIPPON DYNAWAVE PACKAGING USA<\/td> | Spare part to Vent Gas Scrubber<\/td> | 2024-25<\/td><\/tr> |
| MISTAB<\/td> | Rottneros, Vallviks Bruk AB<\/td> | Project management for a new condensor<\/td> | 2024-25<\/td><\/tr> |
| Worley Chemetics Inc<\/td> | Nippon Dynawave Packaging<\/td> | Top Cap, Vent gas scrubber<\/td> | 2025-26<\/td><\/tr> |
| Worley Chemetics Inc<\/td> | PT Riau Andalan P&P, Indonesia<\/td> | Spare parts for different ClO2 absorbers<\/td> | 2026<\/td><\/tr> |
| Termap AB, Rengsj\u00f6, Sweden<\/td> | Billerud G\u00e4vle, Sweden<\/td> | Parts for a new bleach plant scrubber<\/td> | 2026<\/td><\/tr> |
| PIMAB<\/td> | -<\/td> | Demister<\/td> | 2026<\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr> |
| <\/td> | <\/td> | <\/td> | <\/td><\/tr><\/tbody><\/table>\n <\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":" References Purchaser End user Scope of supply Year Chemetics Inc, Canada PT Tanjungenim Lestari P&P Supply of spare parts 2013 Metso\/Valmet Power Oy BillerudKorsn\u00e4s, Karlsborg Project management assistance for a DNCG system 2013-2014 Metso Power Oy Advance Agro Pulp Mill Process design Bleach Plant Scrubber 2013 Metso Power Oy Mets\u00e4 Board Husum Sales assistance 2013 […]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":60,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-4072","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.peoab.com\/en\/wp-json\/wp\/v2\/pages\/4072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.peoab.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.peoab.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.peoab.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.peoab.com\/en\/wp-json\/wp\/v2\/comments?post=4072"}],"version-history":[{"count":0,"href":"https:\/\/www.peoab.com\/en\/wp-json\/wp\/v2\/pages\/4072\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.peoab.com\/en\/wp-json\/wp\/v2\/media?parent=4072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}} |